5 new bridges to cut travel time down to 1 minute at Trade Centre Roundabout

The project will begin construction in November 2024 and aims to enhance traffic flow and connectivity in the heart of Dubai… Five new bridges, spanning 5,000 metres in total, will connect five key roads around the Trade Centre Roundabout: Sheikh Khalifa bin Zayed Street, Sheikh Rashid Street, 2nd December Street, Zabeel Palace Street, and Al
The post 5 new bridges to cut travel time down to 1 minute at Trade Centre Roundabout appeared first on What’s On.

Leave a Reply

Your email address will not be published. Required fields are marked *